Studio Theatre & Studio Foyer
Studio Theatre: (12m x 11m)
Brian Cox Studio Theatre was opened by Brian Cox CBE on 11th September 2006.
- Seating layout is flexible
- Fitted with state of the art equipment and full recording facilities including sound booth
- Equipped with a fully retractable lighting rig and control room
- Designed to allow people of all abilities to take part
- 2 accessible dressing rooms with shower facilities
- Access to cloakroom facilities
Studio Foyer
- With a removable glass wall the foyer outside the Studio Theatre is another bright and airy part of the building
- Removable glass wall opens and extends on to the venue’s private courtyard
- Outside the Studio Foyer, there is fixed recessed bench seating at either side of the entrance to the Studio
- Access to cloakroom facilities is available


